WALL
The real constraint, incentive, authority, dependency, or deadline.
Project Shadow 1.0.1 contains no Myth package. Generic Myth v0.2.0 and Full-Canon Myth v0.3.5 are separate optional companions; both default off, neither is required by R1, and neither can authorize action or change an R1 result. ARM remains a civic repair workshop, not a certification service; publication transfers no authority and is not operational deployment, efficacy, safety, certification, a legal-compliance finding, permission to act, or a global green.
One civic lifecycle / six distinct public doors
The RecordremembersCivic QAinspectsPBHPpausesARMrepairsProject Shadowinstruments + testsALMSIVIpreserves optional originCHAMBER 02 / CORRECTIVE + PREVENTIVE ACTION
CAPA is the discipline of stopping a present deviation, finding the mechanism that produced it, changing that mechanism, and proving the change survived contact with the real world.
SEVEN-STAGE PUBLIC CAPA
Corrective action without prevention is cleanup. Prevention without verification is a promise. Verification without public memory lets the same institution declare victory again.
PBHP / THE PAUSE INSIDE THE REPAIR
Before a consequential step, name the Wall forcing the harmful path, the Gap where burden leaks onto the least powerful, and the smallest Door that preserves the legitimate goal while keeping recovery possible.
The real constraint, incentive, authority, dependency, or deadline.
The place harm escapes the plan—and the person who absorbs it first.
A smaller, safer, reversible path that preserves the legitimate objective.
EFFECTIVENESS REVIEW
A press release, policy publication, model launch, training completion, or changed leader is not evidence that the failure stopped.
One accountable role can explain the fix, produce the evidence, and trigger escalation.
The definition of effective is written before the result is measured.
The test checks who benefited, who still carries burden, and who disappeared from the denominator.
Affected people and independent reviewers can contest the frame, evidence, and claimed closure.
Monitoring continues long enough to detect the old failure returning through a new path.
The result, uncertainty, correction history, and remaining risk are published even when the repair underperforms.